WPB New Construction

Compare West Palm Beach New Construction Condos

Compare West Palm Beach new-construction condos by corridor, timing, floor plans, water views, amenities, and buyer-fit questions.

Bottom line

Start with corridor fit, then compare sourced status, delivery language, released floorplan depth, and open verification notes. North Flagler is the main waterfront comparison set, Downtown is the walkability lane, and South Flagler is the quieter waterfront lane. Pricing, incentives, fees, and exact availability should be confirmed from the current buyer packet.

Comparison snapshot

Start with corridor, project status, delivery assumptions, released floorplans, and what still needs direct verification. This table is a crawler-readable companion to the interactive comparison tool.

BuildingCorridorStatusDeliveryFloorplansBest fitVerification note
Alba Palm Beach North Flagler Under construction / topped out Closings commence June 2026 per the official home page; other official and press items still say early/Spring 2026 10 records Waterfront buyer Delivery language differs between official popup and press coverage.
NORA House Downtown / NORA Sales launched / early interest Construction planned 2027 with finish around 2029 per March 2026 reporting 65 records Walkability buyer Address conflict: official site schema shows 1021 N Railroad Ave, the footer uses 955 N Railroad Avenue Suite B, and older reporting uses 1105 N Dixie Highway for district context.
Olara North Flagler Under construction 2028 per current official/download material 55 records Waterfront buyer Some third-party material says 2027 delivery; current official download material points to 2028.
Shorecrest North Flagler Sales launched / under construction Expected 2027 9 records Waterfront buyer Address conflict: 1865 N Flagler vs 1901 N Flagler.
The Ritz-Carlton Residences, West Palm Beach North Flagler Sales active / under construction; reported more than 70 percent pre-sold in February 2026. Expected 2028 28 records Waterfront buyer Address conflict: 1717 N Flagler, 1745 N Flagler, and Related/legal naming appear in different official contexts.
Alba Reserve North Flagler Planning / approvals process Planning-stage timing not publicly confirmed. Request current packet Waterfront buyer No official website captured.
Apogee West Palm Beach North Flagler Planning 2029 target in seed model; planning-stage timing should be verified. Request current packet Waterfront buyer No official website captured.
Maison d'Or South Flagler Sales launched / pre-construction 2028 timing remains reporting-led; verify with buyer-side review. 2 records Floor-plan-first buyer The official team page labels architecture as 10 Design while the supporting body copy also references SB Architects.
Mandarin Oriental Residences, West Palm Beach North Flagler Sales launched / priority interest Anticipated opening 2031 Request current packet Waterfront buyer No verified floor-plan assets in catalog.
The Berkeley Palm Beach Downtown Now selling / under construction 2028 target in seed/reporting; verify with buyer-side review. 9 records Walkability buyer Official site credits Al Adelson's development legacy but the precise legal development entity should be verified. Fact-sheet contact copy appears incomplete, so sales contact uses the official site footer.
10 CityPlace Downtown Under construction / office leasing Expected 2027 in Related Ross release; precise phasing should be verified. Request current packet Walkability buyer Seed/detail to verify: seed references a 21-story assumption, while Related Ross release describes a 480,000-square-foot office tower without presenting it as condo inventory.
15 CityPlace Downtown Under construction / office leasing Expected 2027 in Related Ross release; leasing page may vary. Request current packet Walkability buyer Verify current pricing, availability, fees, incentives, square footage, delivery timing, and contract terms.
Banyan Tree Residences West Palm Beach Downtown Sales launched / buyer appointment now open Planning-stage timing not publicly confirmed Request current packet Floor-plan-first buyer Residence count conflict: 88 in sales/project sponsor language vs 86 in city PPRC context.
Edgeworth North Tower South Flagler Sales launched / priority list Current reporting points to construction starting in 2027 with an approximately two-year build; design-team material points to 2029 Request current packet Floor-plan-first buyer Residence count conflict: Related Ross 168 vs MAWD 187.
Edgeworth South Tower South Flagler Planning / priority list 2029 in design-team material Request current packet Floor-plan-first buyer Same residence-count conflict as north tower.
Fort Partners South Flagler Assemblage South Flagler Assemblage/watch-list; no public branded condo project yet Site-assemblage timing not publicly confirmed. Request current packet Waterfront buyer No project name, unit count, height, architect, delivery, pricing, official site, brochure, or renderings.

Best-fit buyer lanes

  • North Flagler: waterfront shortlist with the deepest active comparison depth.
  • Downtown West Palm Beach: walkability, restaurants, NORA, The Square, and district energy.
  • South Flagler: quieter waterfront positioning, privacy, and Palm Beach proximity.

Priority building comparison

BuildingCorridorStatusDeliveryFloorplansBest fitVerification note
Olara North Flagler Under construction 2028 per current official/download material 55 records Waterfront buyer Some third-party material says 2027 delivery; current official download material points to 2028.
South Flagler House North Tower South Flagler Under construction Expected/delivering 2027 3 records Waterfront buyer Residence count conflict: 108 vs 105 depending on official/project sponsor source date.
The Ritz-Carlton Residences, West Palm Beach North Flagler Sales active / under construction; reported more than 70 percent pre-sold in February 2026. Expected 2028 28 records Waterfront buyer Address conflict: 1717 N Flagler, 1745 N Flagler, and Related/legal naming appear in different official contexts.
Shorecrest North Flagler Sales launched / under construction Expected 2027 9 records Waterfront buyer Address conflict: 1865 N Flagler vs 1901 N Flagler.
Alba Palm Beach North Flagler Under construction / topped out Closings commence June 2026 per the official home page; other official and press items still say early/Spring 2026 10 records Waterfront buyer Delivery language differs between official popup and press coverage.
The Berkeley Palm Beach Downtown Now selling / under construction 2028 target in seed/reporting; verify with buyer-side review. 9 records Walkability buyer Official site credits Al Adelson's development legacy but the precise legal development entity should be verified. Fact-sheet contact copy appears incomplete, so sales contact uses the official site footer.
NORA House Downtown / NORA Sales launched / early interest Construction planned 2027 with finish around 2029 per March 2026 reporting 65 records Walkability buyer Address conflict: official site schema shows 1021 N Railroad Ave, the footer uses 955 N Railroad Avenue Suite B, and older reporting uses 1105 N Dixie Highway for district context.
Forté on Flagler South Flagler Delivered / closings underway / resale benchmark Official site still markets topped-out / construction-underway language, while The Real Deal reported closings underway in July 2025; request current resale availability and building confirmation 5 records Waterfront buyer Project address vs listing/unit address differences.
Mr. C Hotel & Residences West Palm Beach Downtown Under construction Construction started/financed in 2025; completion needs live confirmation 64 records Walkability buyer Address conflict: 320 Lakeview Ave, 327 Okeechobee Blvd, and 401 S Olive buyer appointment.
Maison d'Or South Flagler Sales launched / pre-construction 2028 timing remains reporting-led; verify with buyer-side review. 2 records Floor-plan-first buyer The official team page labels architecture as 10 Design while the supporting body copy also references SB Architects.

Buyer verification FAQ

What is the fastest way to compare West Palm Beach new-construction condos?

Choose the corridor first, then compare sourced status, delivery language, released floorplans, residence scale, and open verification notes. Current pricing, incentives, fees, and availability should come from the current buyer packet.

Can Downtown, North Flagler, and South Flagler projects be compared directly?

Yes, but they answer different buyer goals. North Flagler is the main waterfront comparison set, Downtown is the walkability lane, and South Flagler is quieter and more residential.

What should buyers verify before relying on comparison pages?

Confirm current pricing, live availability, line and stack, exposure, monthly fees, parking, storage, incentives, delivery timing, contract terms, and whether a public floorplan is still available.