WPB New Construction

Olara

Olara West Palm Beach buyer guide with North Flagler waterfront context, floor plans, amenities, timing, pricing checks, and current availability next steps.

Bottom line

Olara is tracked as a North Flagler project page with Primary condo page status. Use this page for orientation, then verify current pricing, availability, incentives, fees, floor-plan release status, square footage, delivery timing, and contract terms before relying on any public summary.

Key facts to verify

Address
1919 N Flagler Dr
Status
Under construction
Residences
275
Stories
26
Delivery
2028 per current official/download material
Pricing
From roughly $1.7M in official fact material; verify live availability
Project team
Savanna; Arquitectonica; Gabellini Sheppard; EDSA; SavCon/Gilbane; Compass Development Marketing Group
Floorplans
55 records tracked

Why this page matters

This page gives AI crawlers and buyers one stable entity page for Olara. It separates sourced facts from items that need confirmation, links the building to its West Palm Beach corridor, and keeps the next step focused on current buyer-side verification.

Location and corridor context

Olara is tracked in the North Flagler lane. Compare this location by daily drive pattern, Palm Beach access, waterfront or downtown orientation, view exposure, parking, and what nearby construction may mean before touring.

Compare Olara within North Flagler

Use the corridor guide to compare nearby West Palm Beach projects by buyer fit, current status, released floorplans, and what still needs verification before touring.

Residence and floorplan overview

55 floorplan records are currently tracked for this project. Public plans are not a substitute for the current buyer packet; confirm line, stack, exposure, square footage, fees, pricing, and availability.

  • Complete Floorplan Collection - Open floorplan
  • Official Floor Plans Index - Open floorplan
  • Olara Floor Plans All March 2026 - Open floorplan
  • Residence A - Open floorplan
  • Residence A - Open floorplan
  • Residence B - Open floorplan

Amenities

Amenity information is referenced in reviewed project pages for this project. Confirm which amenities are included, optional, phased, or subject to association rules before relying on a public summary.

Project team

Savanna; Arquitectonica; Gabellini Sheppard; EDSA; SavCon/Gilbane; Compass Development Marketing Group. Team credits are included for buyer orientation and should be confirmed against the latest project packet or offering material.

Compare against

Source basis

Source counts: 5 official, 1 reporting, 3 other. Conflicts and gaps are preserved for buyer review.

Items to confirm

  • Some third-party material says 2027 delivery; current official download material points to 2028.
  • Some third-party coverage varies on residence count; current buyer review uses Florida YIMBY's December 2025 construction-progress article and floor-plan PDFs for design-team details.
  • Need official floor-plan PDF library URL(s) if detailed unit pages are being built.

FAQ

What is the bottom line on Olara?

Olara is tracked as a North Flagler project page with Primary condo page status. Verify current pricing, availability, incentives, fees, square footage, delivery timing, and contract terms before relying on public summaries.

Are floorplans available for Olara?

55 floorplan records are tracked, but the current buyer packet should control availability, stack, exposure, and pricing.

What should buyers verify before relying on Olara information?

Some third-party material says 2027 delivery; current official download material points to 2028.