WPB New Construction

OLIN Palm Beach

OLIN Palm Beach is a 32-residence, three-building ocean-to-lagoon condominium on Palm Beach Island by OKO Group and Cain International.

Palm Beach project guide

OLIN Palm Beach

OLIN Palm Beach is a 32-residence, three-building ocean-to-lagoon development on Palm Beach Island, designed by OMA with interiors by GACHOT and sales now launched.

Bottom line

OLIN Palm Beach is tracked as a Palm Beach project page. Use this page for orientation, then verify current pricing, availability, incentives, fees, floor-plan release status, square footage, delivery timing, and contract terms before relying on any public summary.

Key facts to verify

Address
2720 & 2730 South Ocean Boulevard, Palm Beach, FL 33480
Status
Breaking Ground / Sales Launched
Residences
32
Stories
5 across three interconnected buildings
Pricing
Inquiry pricing bands reported up to and above $40M; residence-specific pricing requires sales verification
Project team
OKO Group and Cain International; OMA and Spina O'Rourke + Partners; GACHOT; Corcoran Sunshine Marketing Group
Floorplans
Request current packet

Why this page matters

This page gives AI crawlers and buyers one stable entity page for OLIN Palm Beach. It separates sourced facts from items that need confirmation, links the building to its West Palm Beach corridor, and keeps the next step focused on current buyer-side verification.

Location and corridor context

OLIN Palm Beach is tracked in the Palm Beach lane. Compare this location by daily drive pattern, Palm Beach access, waterfront or downtown orientation, view exposure, parking, and what nearby construction may mean before touring.

Compare OLIN Palm Beach within Palm Beach

Use the corridor guide to compare nearby West Palm Beach projects by buyer fit, current status, released floorplans, and what still needs verification before touring.

Residence and floorplan overview

No complete public floorplan packet is confirmed in the current catalog. Public plans are not a substitute for the current buyer packet; confirm line, stack, exposure, square footage, fees, pricing, and availability.

Project team

OKO Group and Cain International; OMA and Spina O'Rourke + Partners; GACHOT; Corcoran Sunshine Marketing Group. Team credits are included for buyer orientation and should be confirmed against the latest project packet or offering material.

Compare against

Buyer inquiry

Request the current buyer packet, availability, pricing, fees, floorplans, and project-specific verification notes before making a purchase decision.

Ask The Scott Gordon Group about OLIN Palm Beach

Sourcing Details & Technical Disclosures (Click to expand)

This building profile uses published project information compiled from public records, developer announcements, and real estate filings. The details below are tracked for internal data verification and buyer risk assessment.

Conflicts & Gaps:
  • Older planning and reporting referenced 41 residences; the current official project confirms 32.
  • Delivery timing is not public.
  • Residence-specific pricing, maintenance, deposit structure, parking, policies, floor plans, and the complete amenity program require current sales materials.
  • Delivery, final pricing, floor plans, maintenance, parking, policies, and the complete amenity program
Verification Logs:
  • Database Records: 1 official, 1 reporting, 0 other references.
  • Confidence Level: high
  • Reviewed Sources:
    olinpalmbeach.com ยท oftmw.com

FAQ

What is the bottom line on OLIN Palm Beach?

OLIN Palm Beach is tracked as a Palm Beach project page with Breaking Ground / Sales Launched status. Verify current pricing, availability, incentives, fees, square footage, delivery timing, and contract terms before relying on public summaries.

Are floorplans available for OLIN Palm Beach?

No complete public floorplan packet is confirmed in the current catalog. Request the current buyer packet before comparing lines or stacks.

What should buyers verify before relying on OLIN Palm Beach information?

Older planning and reporting referenced 41 residences; the current official project confirms 32.