WPB New Construction

CityPlace Movie Theater Proposed for 515 Fern in West Palm Beach

Related Ross proposes a CityPlace cinema at 515 Fern in West Palm Beach, targeting 2030 subject to reapproval. See the concept and an example Brightline walk.

Editorial AI concept of a cinema entrance, visibly labeled AI CONCEPT — NOT A DEVELOPER RENDERING. This is not the proposed 515 Fern design.
Editorial AI concept for this article, not a developer rendering or a depiction of the future 515 Fern design. Architecture, signage and entrance location are illustrative. · Credit: WPB New Construction · AI-generated editorial concept

Bottom line

Related Ross targets 2030 for a proposed downtown cinema, with eight auditoriums in the current concept. Reapproval and an operator selection remain ahead.

How to use this guidance

Use the guidance to frame questions before comparing West Palm Beach buildings. Then check project pages, current floor-plan packets, source-linked updates, and The Scott Gordon Group at Douglas Elliman for the details that can change.

A cinema returns to the conversation at 515 Fern

Related Ross is proposing a movie theater within its planned 515 Fern office building near Brightline’s West Palm Beach station. In a November 20 WFLX/WPTV interview, executive vice president Jordan Rathlev described a concept with eight auditoriums and about 800 seats.

The proposal would put another evening destination in the downtown mix. It remains part of an office-building redesign, with the cinema being taken through reapproval.

Targets 2030, with approvals still ahead

Rathlev said Related Ross hopes to secure approvals by the end of 2027 and open in 2030. That is a developer target, not a confirmed opening date. The earlier building approval does not establish approval of this cinema redesign.

No theater operator had been chosen at the November 20 announcement. Seating technology, food service and other features were still being considered; the auditorium illustration below does not establish any of those details.

Editorial AI auditorium illustration with a visible INTERIOR NOT CONFIRMED label; seating, screen and finishes are illustrative.
Editorial AI illustration, not a developer rendering or confirmed cinema interior. Seating, screen, finishes and features shown are illustrative, not a commitment for 515 Fern. · Credit: WPB New Construction · AI-generated editorial illustration

An example walk from Brightline to CityPlace

The map follows existing sidewalks from Brightline’s public entrance walk to the proposed site’s Evernia Street frontage, then west along Evernia and south on Rosemary Avenue toward CityPlace. The endpoint is the plaza-side curb by the Wishing Tree, rather than the tree itself.

On this example route, the first leg is approximately 330 feet and the second approximately 1,800 feet: about 0.40 mile in total, or an estimated 8–10 minutes on foot. This is not a claim for the shortest possible route. Stops are schematic, and crossing waits, walking pace and detours can change the trip.

The map does not identify a future cinema entrance or rely on a proposed connector. Open the walking map at full size.

Example existing-sidewalk route: Brightline public entrance walk to 515 Fern’s Evernia frontage, about 330 feet, then via Evernia and South Rosemary to the CityPlace Wishing Tree plaza-side curb, about 1,800 feet. Total about 0.40 mile, 8–10 minutes. Schematic stops; no future entrance or connector.
One example route measured along existing OpenStreetMap sidewalks: approximately 330 feet from Brightline’s public entrance walk to the proposed site’s Evernia frontage, then approximately 1,800 feet via Evernia and South Rosemary to the plaza-side curb by CityPlace’s Wishing Tree. About 0.40 mile / 8–10 minutes in total. Estimates and schematic stops; not necessarily the shortest route. No future cinema entrance or proposed connector is shown. Follow posted crossings and detours. · Credit: WPB New Construction · Map data © OpenStreetMap contributors; destination references: Brightline and CityPlace

What matters for someone choosing a downtown address

A neighborhood’s appeal often comes from ordinary evenings: an easy dinner, a walk, and somewhere to go afterward. A cinema could extend that routine beyond restaurants and shopping if the proposal moves forward. That is the lifestyle question to follow here.

For buyers, the practical distinction is between the neighborhood available now and the one described in development plans. Walk from the actual residence you are considering, look at the crossings and evening activity, and compare the places already operating. A nearby proposal should not be treated as an amenity included with a condo or assumed to open by your move-in date.

515 Fern also needs to stay separate from residential inventory. This announcement offers no condo pricing or availability, and its cinema target does not set the delivery schedule for another building.

The next checkpoints

The next useful signals are a decision on the redesign, an announced operator and a confirmed construction and opening schedule. Related Ross’s older office webpage still describes a different, 25-story scheme and a planned connector; those details are background, not the basis of the current sidewalk map.

Explore the Downtown West Palm Beach corridor to compare residential locations, or ask us about a downtown shortlist.

Reviewed sources

How changing project information is checked